Reduce Data Center Cooling Power.
Redeploy it as Compute.

⚊ Brightcore EDGE™ Cooling for Data Centers

Brightcore’s patent-pending geothermal cooling solution for new and existing data centers reduces the power required for cooling and unlocks additional compute capacity for the same total site power. 

More servers. More tokens. More value. Without more power.

Cooling is competing with compute.

Cooling is the largest load in a data center that earns no revenue. At up to 45% of total site energy, it isn’t just overhead, it competes with your servers for the same power.

So operators pay twice: first for the energy to get rid of heat, and again in the compute revenue that power could have earned.

Make every megawatt matter.

Brightcore EDGE™ is a bilateral, hybridized cooling platform designed to deliver the lowest watt-per-token cooling available. It pairs geothermal cooling with dry coolers and optional chillers, so each heat-rejection method runs when it performs best.

 

Brightcore Edge

SYSTEM DESIGN

Our closed-loop geothermal borefield is 2-3x smaller and more cost-efficient than traditional geothermal designs. It fits within your site footprint, deploys in months (not years), and the CAPEX is comparable to conventional cooling systems.

COOLING MANAGEMENT

Brightcore EDGE™ software utilizes proprietary predictive algorithms to continuously optimize across geothermal, dry coolers, and optional chillers to deliver 100% of cooling demand, 24/7/265, for the life of the system.

  • Up to 85% cooling power reduction*
  • Cooling drops from 25%-45% to 4%-6% of total site power*
  • Peak PUE 1.09 or lower*
  • High temperature liquid cooled compute versus conventional chiller-based cooling

  • *Two ways to use the power savings
  • Add more compute without adding more power
    • 10%-20% more compute
    • $4.1B NPV**
  • Lower your energy spend
    • 10%-20% less site energy
    • $1.1B NPV**
  • In most cases, geothermal costs the same or less as conventional solutions by reducing the equipment required.

  • Noise: reduce or eliminate chillers, downsize the number of dry coolers required
  • Space: reduce the amount of above ground conventional cooling equipment; systems can be built under parking lots, below above- ground equipment and buildings
  • Water: 0 WUE, eliminate water consumption for cooling
  • Reliability: The combined solution serves 100% of the cooling demand 24/7/365
  • Lower maintenance: fewer moving parts and no major equipment replacements

Lighting
VFD Motors

One integrated product.

  • System design & construction
      • 2-3x smaller borefield versus traditional geothermal designs
      • Quality construction executed or managed by Brightcore
  • System design & construction
    • Real-time control optimization integrated with building management systems (BMS/BAS)
    • Long-term thermal management of the geothermal borefield maintains peak performance

Deployed in months.

  • A 250MW data center geothermal borefield can be installed in 6 months
  • Modular borefield design means installation happens in phases so cooling comes online as it gets built, minimizing speed to first token

Scalable to all data centers.

From small megawatt self-hosted sites, up to giga-scale AI factories

  • Next-gen AI / HPC: Highest efficiency, chiller-free design ideal for high-temperature compute
  • Retrofit: Phase in geothermal, then downsize or retire chillers
  • Legacy upgrade: Add geothermal to cut energy spend and extend existing equipment life

*Performance and savings represent a geothermal solution combined with dry coolers and no chiller-based cooling. Geothermal and dry coolers provide 100% of the data center cooling load including high temperature liquid cooled compute and medium temperature air cooled whitespace. Savings are compared to conventional chiller-based cooling.

**Performance and savings represent a geothermal solution combined with dry coolers and no chiller-based cooling. Geothermal and dry coolers provide 100% of the data center cooling load including high temperature liquid cooled compute and medium temperature air cooled whitespace. Savings are compared to conventional chiller-based cooling. Economic assumptions; 15-year NPV vs. chillers, 10% WACC; high-performance compute at $400k/rack cost, $150k/yr/rack revenue; electricity $0.10/kWh. Results vary by site, geography and configuration; for discussion purposes only, contact our team for more details.

Brightcore EDGE™ Geothermal Cooling.

Every MW Matters.

Have questions? Learn more through our Data Center Geothermal Cooling FAQs